The plans also include a big battery at the internet site, to be certain excess ability can be saved to the evening, and also a 220 kV transmission line that will connect the task to the North Star sub-station, near exactly where a new a hundred MW solar challenge can https://totalsolar.com.au/terms-and-conditions/