Penmann has completed a tailored HVAC upgrade at Nutricia’s Liverpool facility, implementing a bespoke ventilation and climate control system built to comply with demanding hygiene and production criteria. The scope included the design, supply, installation and commissioning of high-specification HVAC systems across civil, Medium Care (MC) and High Care (HC) https://bookmarkingdepot.com/story20586324/penmann-completes-specialist-hvac-installation-for-the-liverpool-based-nutricia-facility-in-line-with-fsi-phase-1-and-2